ID 608825

Archived

Wastewater Treatment Plant Primary Digester 1 Cleaning, Farmington, NY

Ontario County

Owner Reference: MRB Project #0610.21004

Bid Date: 12/21/2021 at 01:00pm

Pre-Bid: 12/07/2021
1216 McMahon Road, Victor, New York

Trades: General Engineering Contractor GEC

The project consists of the removal of sludge, rags, debris, rainwater, etc. in Primary Digester #1. The Contractor shall provide means and labor to achieve this. The Contractor will need to perform their own testing on the sludge to determine appropriate disposal methods. After removal of digester contents, the Contractor shall also pressure wash the interior of the digester and provide a means to remove all washwater as well.

Bonds required. Prevailing wages.

Town of Farmington NY

Michelle Finley
 (315) 986-8100
 (315) 986-4377
 Login or create an account To view email

Published 11/24/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.