ID 625641
Archived
San Diego County
Owner Reference: K-22-2065-DBB-3
Bid Date: 06/03/2022 at 02:00pm
Estimate: $8,610,000.00 Start/Delivery Date
Trades: A - General Engineering Contractor GEC, C34 - Pipeline Contractor: Oil, Gas, Petroleum & Related Structures
Construction of Water Group 952 consists of the installation of approximately 7440 linear feet of 8 inch, 12 inch, and 16 inch water mains, water services, valves, fire hydrants and markers, resurfacing, curb ramps, and all other related work and appurtenances. Project duration is 416 working days. Subcontracting participation percentages apply to this contract. 1. SLBE participation 8.9% 2. ELBE participation 13.4% 3. Total mandatory participation 22.3% Bonds required. Prevailing wages.
City of San Diego CA
Rosa Riego
(619) 533-3426
Login or create an account To view email
Published 04/16/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.