ID 580036

Archived

Water Main Replacement N Fowler Ave, Fresno, CA

Fresno County

Owner Reference: 3802

Bid Date: 04/20/2021 at 03:00PM

Estimate: $558,000.00

The scope of work includes, but not limited to, replacement of an existing 12" water main along Fowler Avenue between Clinton and Princeton Avenues with a 16-inch water main, replacement of domestic and fire service branches and meters, trench and backfill, slurry seal, and replacement of any disturbed surface facilities including striping and traffic loops. Project duration is 60 working days. Questions are due by 3:00 PM on Apr 13th. Bonds required. Prevailing wages apply. The mandatory participation level for National Targeted Workers is 15%

City of Fresno CA

Sherri Cuadros
 (559) 621-1151
 Login or create an account To view email

Published 03/25/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.