ID 580525
Archived
Shasta County
Owner Reference: 4500210-006C / 19-067
Bid Date: 05/14/2021 at 03:00PM
Pre-Bid: 04/14/2021
Interested bidders should meet at the water treatment facility located at 9367 Mountain Meadow Road, Shingletown, California 96088.
Estimate: $1,500,000
This project is in Shingletown, California and includes sitework, demolition and modifications to an existing water treatment plant; construction of a 390,000-gallon welded steel water storage tank with concrete ring-wall foundation; construction of a 360 sq. ft booster pump station building, and associated structural, mechanical, electrical and controls; and installation of approximately 215 water meters, all as included in the Bidding Documents. Work shall be completed within 365 Calendar Days. Bonds required. Prevailing wages apply. DBE GFE required.
Lassen Pines Mutual Water Company, Inc, CA
Joe Riess
(530) 604-5977
Published 03/30/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.