ID 539763

Archived

WCC Replace Roofs R1 and R2 Project, Shelton WA

Mason County

Owner Reference: 2018-319 H (2-1)

Bid Date: 06/04/2020 at 02:45pm

Pre-Bid: 05/28/2020
at the rear west gate shack/sally port via service entrance, at Washington Corrections Center, 2321 W. Dayton Airport Road, Shelton, WA 98584, To be considered, Security clearance is required in order to attend the Pre-Bid Meeting. Those wishing to attend MUST provide a Clearance Application to Don Carlstad NO LATER THAN 11:59 P.M., Monday, May 25, 2020. Contact Don Carlstad for the Clearance Application at dacarlstad@doc1.wa.gov or phone (360) 427-4661. For specific directions for an on-site pre-bid walk-through, please contact the Don Carlstad.

Estimate: $1.9M - $2.1M

10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans WCC Building R: a. As indicated on plans, remove existing roofing system to concrete deck. Install new roofing system and flashings. Remove internal roof drains; and build-up tapered insulation to slope deck to building perimeter. b. Install new gutters and galvanized downspouts to grade. c. Remove mechanical exhaust fans and curbs; and replace with new. d. Provide electrical as required to support work. e. Install new swing gate for fenced yard area.

Department of Enterprise Services, WA

Young Kim
 (360) 407-7929

Published 05/19/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.