ID 629394
Archived
Tulare County
Owner Reference: 21/22 - CP1936
Bid Date: 07/19/2022 at 02:30PM
Estimate: $917,235
Trades: C57 - Water Well Construction - Drilling, Installation, Improvements & Repairs, A - General Engineering Contractor GEC
Provide all labor, materials, equipment, transportation, and services for the drilling a 710-foot-deep pilot hole, conducting geophysical logging and water quality sampling in the pilot hole, reaming the pilot hole and constructing a 690-foot deep production well, using the reverse rotary drilling method. The work includes supplying all labor, materials, and equipment, performing all drilling, geophysical logging, zone sampling, testing, developing, and test pumping, placing all casing, gravel pack and seals, and cleanup at the site specified herein. 50 working days. Bonds required. Prevailing wages.
City of Porterville CA
Jasmine Mejia
(559) 782-7451
Login or create an account To view email
Published 05/19/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.