ID 582294

Archived

Westside Mobility – Phase 2, CD 5 Westside Traffic Signal Improvements & Warner Center Project, Los Angeles, CA

Los Angeles County

Owner Reference: 42001 / E1908861

Bid Date: 05/12/2021 at 10:00AM

Pre-Bid: 04/15/2021
Google Meet. Phone: 417-355-8461 PIN 585 860 675# Internet: meet.google.com/ony-aoer-ssm Los Angeles, CA 90015

Estimate: $5,084,771.00

This project consists of traffic signal improvements at 24 intersections within Council Districts 3, 5, 11 and 12 that will improve safety and mobility for pedestrians, bicyclists and transit users. The proposed project includes the installation of new traffic signals with curb ramp upgrades, the installation of left turn phasing at existing signalized intersections, and the installation of Pedestrian Hybrid Beacons at intersections throughout the City. 8% Local Business Preference applies. The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3%. Bonds required. Prevailing wages apply.

City of Los Angeles, Public Works, CA

Adam Driscoll
 (213) 847-0100
 (213) 847-5172
 Login or create an account To view email

Published 04/14/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.