ID 639807
Archived
Brevard County
Owner Reference: B-23-09-COC
Bid Date: 10/12/2022 at 03:00pm
Pre-Bid: 09/21/2022
Dyal Water Treatment Plant 28400 SR 520 Christmas, Florida 32709
Trades: WWTP Wastewater Treatment Plant Construction & Repairs: Tank Pressure Washing - General Engineering Contractor, Other Tanks - General Engineering Contractor, CG - General Engineering Contractor GEC, RG - General Engineering Contractor GEC
The selected vendor will remove the existing four (4) Polyethylene Tanks, provide and install two (2) new Fibreglass Reinforced Plastic (FRP) tanks, install concrete pads and concrete curb, install new connections and piping. The Work will be substantially complete within One Hundred and Twenty (120) days after the notice to proceed. Final completion will be within Thirty (30) days of substantial completion. Questions via email to Owner by 9/30/2022, 5:00pm. Bonds required. Prevailing wages.
City of Cocoa FL
Brian Dale
(321) 433-8833
Login or create an account To view email
Published 09/07/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.