Trades: WWTP Wastewater Treatment Plant Construction & Repair: Tank Power Wash, Pressure Washing - General Engineering Contractor, General Engineering Contractor GEC

The Project generally consists of the following major items: 1. Supply and installation of six (6) three-stage vertical paddlewheel flocculators with adjustable frequency drives. There are (2) two Flocculation Basins. Three (3) flocculators will be added per basin. 2. Supply and installation of three accesses platforms installed perpendicular to the flocculation basin flow, Baffle walls between the flocculators. 3. Demolition of existing flocculation drive well. 4. Supply, installation and all tie-ins of electrical utilities. 5. Installation of a project entrance and concrete driveway, as well as fencing, and an entrance gate. 6. All associated civil/sitework, piping, structural, electrical, and instrumentation work for the completion of the project. 7. A City allowance. The time allowed for Substantial Completion is 240 days, and the time allowed for Final Completion and readiness for final payment is 270 days from the date of commencement. Questions via email to Owner by 5/27/2022, 4:00pm. Bonds required.

City of Canton GA

Greg Goodman
 770) 751-7517
 Login or create an account To view email

Published 05/16/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.