ID 628877
Archived
Cherokee County
Owner Reference: 409417
Bid Date: 06/07/2022 at 10:00am
Pre-Bid: 05/24/2022
Canton Water Treatment Plant, 150 Bobby E. Bishop Drive, Canton, GA, 30114
Trades: WWTP Wastewater Treatment Plant Construction & Repair: Tank Power Wash, Pressure Washing - General Engineering Contractor, General Engineering Contractor GEC
The Project generally consists of the following major items: 1. Supply and installation of six (6) three-stage vertical paddlewheel flocculators with adjustable frequency drives. There are (2) two Flocculation Basins. Three (3) flocculators will be added per basin. 2. Supply and installation of three accesses platforms installed perpendicular to the flocculation basin flow, Baffle walls between the flocculators. 3. Demolition of existing flocculation drive well. 4. Supply, installation and all tie-ins of electrical utilities. 5. Installation of a project entrance and concrete driveway, as well as fencing, and an entrance gate. 6. All associated civil/sitework, piping, structural, electrical, and instrumentation work for the completion of the project. 7. A City allowance. The time allowed for Substantial Completion is 240 days, and the time allowed for Final Completion and readiness for final payment is 270 days from the date of commencement. Questions via email to Owner by 5/27/2022, 4:00pm. Bonds required.
City of Canton GA
Greg Goodman
770) 751-7517
Login or create an account To view email
Published 05/16/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.