ID 570589

Archived

WWTP Improvements Phase 1 - Pasco, WA

Franklin County

Bid Date: 02/24/2021 at 02:00pm

Pre-Bid: 01/26/2021
1015 S. Grey Ave., Pasco, WA 99301

This project consists of improvements and modifications to the City’s existing municipal wastewater treatment plant which includes furnishing all labor, materials and equipment necessary for the construction of new primary effluent structures and piping, two new aeration basins, alterations to two existing aeration basins, a blower building expansion, addition of two new blowers, modifications to two existing blowers, RAS pump system distribution improvements, a new effluent flowmeter facility, approximately 1,150 feet of new 42-inch diameter outfall piping, new primary power switchgear, associated electrical and control systems. Bonds Required. Prevailing Wages

City of Pasco, WA

Jon Padvorac
 (509) 544-3080
 Login or create an account To view email

Published 01/12/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.