Wylie to Rockwall Relocation Pipeline Phase I, Rockwall Co., TX

Rockwall County

Owner Reference: 101-0526-18

Bid Date: 10/06/2020 at 02:00pm

Pre-Bid: 09/29/2020
Virtually held. Call in Number: 415-655-0001 or 469-210-7159; Attendee Access Code 13894037

Estimate: $15,000,000.00

This Project includes construction of the following: Northern 42” Alignment - Construction of approximately 10,500 linear feet of 42-inch steel pipe from the 48-inch CIP line to the north and the interconnection with the 30-inch line running south between Bear Creek No. 2 and Mt. Zion WSC. John King 20” - Construction of approximately 5,200 LF of 20-inch steel pipe for the interconnection line between the new 42-inch pipeline and the existing 20-inch pipeline along SH 205. Northern Interconnection - Construction of approximately 5,700 LF of 48-inch steel pipe for the interconnection line between the existing 90-inch discharge at HSPS 3-1 and the CIP 48-inch pipeline at East Fork No. 1. SH 78/205 20” Interconnection - Construction of approximately 55 LF of 20-inch steel pipe for the interconnection/relocation at SH 78 and SH 205. Removal and abandonment of approximately 18,000 LF of existing 20” water line along SH 205 from SH 78 to John King Blvd.

North Texas Municipal Water District, TX

Construction Services
 (972) 239-9949
 Login or create an account To view email

Published 09/17/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.