Archived
Anne Arundel County
Owner Reference: CAP22000101/X7388280
Bid Date: 11/02/2021 at 01:30pm
Pre-Bid: 10/12/2021
Via Zoom. To attend, please register in advance for the meeting at:
https://cbre.zoom.us/meeting/register/tJUpceyhpzkpHNXcqSF7WnP93RG43iTe91En
Estimate: $1m-$1.5m
The Work includes the following major items: Replacement of the existing 6-inch diameter ductile iron force main using pipe bursting/splitting methods with approximately 2,854 LF of 8-inch HDPE DR-11 pipe from the Stone Haven Sewage Pumping Station (SPS) to the existing 16-inch force main bypass connection point between Solley Road and Half Circle, temporary bypass pumping, and associated maintenance of traffic and site restoration work.
Bonds required.County of Anne Arundel MD
Beverly Ingram
(410) 224-1277
Login or create an account To view email
Published 09/30/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.