ID 726769
Cullman County
Owner Reference: PR-I065(555) & PR-I065(556)
Bid Date: 11/08/2024 at 10:00am
4 Days until bid date
Estimate: $2,206,631 to $2,696,993
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S
Constructing the Roadway Safety Improvements (Pipe Rehabilitation and Drainage Structure Corrections) on I-65 from the SR-69 Interchange (Exit 299) to the Morgan County Line. Length 18.692 mi. Bonds required. Prevailing wages.
Office of Engineer: Plans & Proposals
Login or create an account
Login or create an account
Owner: State of Alabama Department of Transportation (ALDOT) AL
Published 10/16/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.