ID 737390
Apache County
Owner Reference: P25-PW-106015-500575
Bid Date: 01/22/2025 at 03:00pm
7 Days until bid date
Trades: *At Risk Construction Management CMaR
This project Design and Construction is funded by the State of Arizona Legislative Funding. The Second Bridge and Roadway network have been determined to be needed for Emergency Evacuation and Emergency Access to serve the isolated Island Community should the London Bridge and utilities within the superstructure be deemed unpassable or unusable. The Second Bridge will provide a secondary alternate route.. The Second Bridge Project will consist of a bridge and connecting roadway alignments from Palo Verde South at London Bridge Road to the new bridge and from the new bridge to McCulloch Boulevard on the Island. New utility lines will be within the bridge and connected to their respective existing systems, of specific note is the water and wastewater systems. Sidewalks and bicycle lanes will be incorporated into the bridge for connectivity to the existing multi-use paths on the Island, at McCulloch, and on the mainland side to the Bridgewater Channel Pathway and the London Bridge Road Bike Lane and Pedestrian system. The connecting roadway alignments must have little to no impact on private properties. Bonds required.
Purchasing
Login or create an account
Login or create an account
Owner: City of Lake Havasu AZ
Published 01/06/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.