CBS ID: 757012
Maricopa County
Owner Reference: 325000384, Project No. ST0980 & TS1620
Bid Date: 05/27/2025 at 01:00pm
Pre-Bid: 05/01/2025 @ 09:00am
Estimate: ST0980 $14.559M; TS1620 $2.396M
Trades: *A&E Architecture & Engineering: Consulting & Design Services: Professional, EOR Services, Feasibility Study, *At Risk Construction Management CMaR
The project consists of design and construction phase services in support of construction of the project. The responsibilities of the A/E are set forth in the attached Pro forma contract for A/E services (Form CIP4.2.3) and Scope of Work (Form CIP4.2.4 for Engineers or Form CIP4.2.5 for Architects). ST0980: Complete Higley Road improvements from ΒΌ mile south of Riggs Road to south of Stacey Road to major arterial standards including dual left turn lanes. Project to include new roadway, streetlights, sidewalks and landscaping. TS1620: Construction of a minor arterial traffic signal at the intersection of Higley Road and Coldwater Boulevard and connection to the signal system. Construction of intersection ramps to comply with Public Right-of-Way Accessibility Guidelines (PROWAG)
Jennifer Lauria
Login or create an account
Login or create an account
Owner: Town of Gilbert AZ
Published 04/28/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.