CBS ID: 759893
Maricopa County
Owner Reference: PW 25-075
Bid Date: 06/17/2025 at 05:00pm
Pre-Bid: 05/27/2025 @ 01:00pm
Trades: A-12 - Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Work included in this project consists of the rehabilitation of approximately 3357 LF of large diameter sanitary sewer pipes ranging from 15- inch to 21-inch by the method of Cured-in-Place pipe (CIPP) lining. In addition to the CIPP task, work will also include; traffic control, public notifications, bypass to divert sewage flows, sewer structure cleaning, remote CCTV inspection of existing and rehabilitated sewers, and restoring areas disturbed by construction activities back to pre-construction conditions. Bonds required. Prevailing wages.
Laura Robinson
Login or create an account
Login or create an account
Owner: City of Avondale AZ
Published 05/13/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.