CBS ID: 761726
Maricopa County
Owner Reference: 32500079
Bid Date: 07/15/2025 at 03:00pm
Bids Today
Pre-Bid: 06/03/2025 @ 01:00pm
Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Complete removal and reconstruction of AP for Edison Ave. The existing asphalt varie3s from 17ft to 24 ft in width. There is currently no edge treatment along the length of Edison. There are curb returns at 2nd, 3rd and 4th Sts. All of ramps at 2nd, 3rd & 4th Sts will have to be reconstructed to meet the current Ada requirements using MAG Standard 236-1. Edison will be reconstructed on an alignment that uses the southern lip of curb. Locating the street at this location will maintain the existing clearance between the edge of pavement and existing power poles. Object markers will be added to the east and west sides of the power poles, (with AP’s approval). Signing and striping as necessary including hydrant markers. Also work on Roosevelt and Eason Aves. Bonds required.
Juan Malave, email only
Login or create an account
Login or create an account
Owner: City of Buckeye AZ
Published 05/22/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.