Rattlesnake Detention Basin Construction Phase 2, Mohave Co, AZ
- Owner Reference
- 2026-047-IFB
- Bid Date
- May 12, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 4/23/2026 @ 09:00am @ (for location please or )
- Estimate
- $1.0M - $5.0M
- Owner
- County of Mohave
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
This project consists of construction of 2 detention basins on Flood Control District land north of the City of Kingman with access from Grace Neal Parkway. The work site is located in a portion of Sections 15 & 22 of Township 22 North, Range 16 West. The basins are designed to be formed by excavation and embankment.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 820017 | Published 4/20/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208