GAOA Gibb Wash Bridge Replacement, Coronado National Forest, Tucson, AZ
- Owner Reference
- 127EAX26Q0022
- Bid Date
- May 15, 2026 at 05:00pm
- Questions Due By
- May 4 at 4:30pm
- Pre-Bid
- Scheduled, Optional - 4/29/2026 @ 10:00am @ (for location please or )
- Owner
- US Department of Agriculture (USDA)
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. Bridge replacement work consists of the removal of an existing 24 long, single-lane timber bridge and the installation of a 28-1 span, 9-6 rise, and 28 long steel structural plate arch with welded wire headwalls. Additional work includes embankment construction with mechanically stabilized earth (MSE) wall, realignment of 550 feet of approach road, installation of a 24 diameter CMP culvert, installation of guardrails, reconstruction of stream channel, and obliteration of the existing approach road.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 819643 | Published 4/18/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208