Main Wastewater Treatment Plant Secondary Clarifier Rehabilitation Phase 4, Oakland CA

Alameda County

Owner Reference: SD459

Bid Date: 10/02/2024 at 01:30pm

Pre-Bid: 09/18/2024 @ 10:00am

Estimate: $6,500,000 to $8,000,000

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Work includes: (1) Rehabilitating Clarifiers 4 and 11 by replacing the clarifier equipment, refurbishing the bridge, resurfacing the concrete surfaces, rebuilding drives, refurbishing influent gates, and replacing electrical equipment, (2) installing new sump pits at 5 clarifiers, (3) installing new sump pumps at 6 clarifiers, (4) providing new 120V, 208V, and 480V and control wiring for Clarifiers 8, 11, and 12, (5) inspecting clarifier return activated sludge pipeline and providing Cure-In-Place Piping rehabilitation if required for 2 clarifiers, (6) inspecting the closed conduit secondary effluent channel, (7) regrading and replacing the soil adjacent to the clarifiers with new material, and (8) replacing actuators on the influent gates at 8 clarifiers. Bonds required. Prevailing wages.

Diego Lucen
 Login or create an account

Owner: East Bay Municipal Utility District (EBMUD) CA

Published 08/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450