Sewer Lift Station Maintenance Services, Laguna Beach, CA

Orange County

Bid Date: 06/16/2025 at 05:00pm

Pre-Bid: 05/19/2025 @ 10:00am

Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C10 - High Voltage Electrical Contractor (HVE): Substation, Transmission/Power Lines, Venues, Arenas, Utility, Transformers, Breakers

The work generally includes, but is not limited to, furnishing all materials, labor, equipment, fuel, tools, transportation, and services necessary to perform both routine quarterly and annual preventative maintenance, as well as unscheduled maintenance, repairs, replacements, retrofits, and adjustments. These services are required to maintain pumps, motors, and related mechanical and electrical power and control systems, and to provide inspections, testing, and emergency response for the CITY’s three largest sewer lift stations: Main Beach, Laguna SOCWA, and Bluebird SOCWA. Additionally, the Contractor must be able to respond to emergency maintenance or repair items for any of the CITY-wide lift stations within two (2) hours, and within forty-eight (48) hours for non-emergency maintenance or repair items.

Richard Gonzales
 Login or create an account
 Login or create an account

Owner: City of Laguna Beach CA

Published 05/06/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.