Installation of Pavilion-style shade structure and concrete pad -Arrowhead Park, Centennial, CO

Arapahoe County

Owner Reference: RFQ-TM-2022-0000000025

Bid Date: 03/13/2025 at 02:00pm

Trades:  *Construction Management; General Contractor "CMGC", Construction Manager-as-Constructor "CMaC", & Construction Administration

In a 14' x 14' space located within a park and near the playground (exact location to be determined), remove existing turfgrass and regrade area, performing any necessary excavation to ensure concrete pad is level and plumb. Pour concrete pad and install a single-tier 24-gauge steel shelter having a powder coat finish. (See attched pdf for image of tyoe of shelter required). Protection and care must be taken for all grass, sprinkler systems, sidewalks, parking lot and lights in the area. The concrete pad must have proper water drainage. All debris must be removed. Because the job site is located within the City of Centennial, CO any and all necessary permits must be obtained. If you would like to view the site, feel free to contact either Tom Mehl or Jude Buemi by E-mail: or phone. The Smoky Hill Metropolitan District is exempt from Colorado state sales tax. The Park main (South) entance is at 18363 E Crestline in Centennial CO. Installation site will be adjacent to the playground area of the park

Tom Mehl
 Login or create an account
 Login or create an account

Owner: Smoky Hill Metropolitan District CO

Published 02/19/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.