Woodlake Trail Improvements Project, Colorado Springs, CO

El Paso County

Owner Reference: IFB-25-057

Bid Date: 06/18/2025 at 04:00pm

Trades: CO-05 - Earthwork & Paving Contractor: Road Resurface, Seal Coat, High Friction Treatment, Milling, Asphalt, Land Clearing, Trails/Path, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Rodding, French Drains, Dewatering, Water Swales, CO-01 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The project includes improving existing trails that were damaged from rain and flooding in 2023. Since this time, the trails have been graded to make them accessible to the public, but they have not been repaired. The project aims to fix existing trails to restore their surface, improve drainage culverts, and fix erosion along the trail corridor. Work will be completed at 12 locations as identified and described in the attached spreadsheet. Bonds required.

Matthew Marter
 Login or create an account
 Login or create an account

Owner: County of El Paso CO

Published 05/21/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.