Replacement of a Nine Mile Raw Water Line, Durango CO

La Plata County

Owner Reference: 2025-0010

Bid Date: 03/13/2025 at 03:00pm

Pre-Bid: 02/27/2025 @ 11:00am

Trades: CO-22 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Pipe Inspection Camera, *A&E Architecture, Engineering Services & Design: Professional, Consultant, EOR Services & Consulting

The City of Durango invites all interested, qualified persons or firms capable of providing the required information to submit a statement of Qualifications and Interest (RFQ&I) for the Replacement of a Nine Mile Raw Water Line, which starts from the intake on the Florida River to the Durango water treatment plant. The existing pipeline is more than 70 years old and ranges in diameter from 12” to 24”. It is comprised of several different types of materials. This line is a gravity-fed raw water transmission line to the city's reservoir. Bonds required. Prevailing wages.

Bob Grogan, Jr.
 Login or create an account
 Login or create an account

Owner: City of Durango CO

Published 02/08/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450