CBS ID: 751973
Pueblo County
Owner Reference: 25-042 (CIAN20)
Bid Date: 04/23/2025 at 11:00am
Pre-Bid: 04/08/2025 @ 01:30pm
Trades: Supervisory Control & Data Acquisition (SCADA): Real-Time Data Utility Automation, Controllers/Timing, Remote Terminal Unit RTUs
This project consists of removing and replacing the electrical room cooling split unit, Liebert 8-ton, at the Pueblo Municipal Justice Center. Contractor should plan to conduct an assessment of the existing Liebert system. Replacement unit shall be of similar make and model. Product submittal shall be approved by the City prior to purchase. Work shall also include new line set, new low voltage wiring, new thermostat, and any roof modifications required for installation. Contractor shall provide a full design of the new proposed system to include all necessary drawings, stamped by a Colorado licensed Professional Engineer, in order to apply for and secure permits with the Pueblo Regional Building Department. Prior to acceptance by the City, contractor shall provide a testing, adjusting, and balancing (TAB) report for review and approval by the City. Bonds required. Prevailing wages.
Deborah Rivera
Login or create an account
Login or create an account
Owner: City of Pueblo CO
Published 04/01/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.