Hart Middle School Modernization and Internal Swing Site, Washington, DC

District of Columbia County

Owner Reference: DCAM-24-CS-RFP-0029

Bid Date: 10/04/2024 at 02:00pm

Pre-Bid: 09/17/2024 @ 04:00pm

Trades: Site Preparation, Sitework, Prep Work/Prepwork - General Engineering Contractor, *General Engineering Contractor GEC; Subcontractor Opportunities, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, Industrial Building Construction, HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's, Underground Utility Contractor

The Design-Builder shall design and construct the renovation of the existing building footprint to the Educational Specifications (“Ed Specs(s)” or “Educational Specifications”) to bring it in line with the District of Columbia Public Schools (“DCPS”) Ed Specs. The Design-Builder will also be responsible for designing, coordinating, and executing an internal swing plan to keep the school population on-site throughout the Project. It is expected that a bubble/tent and kitchen trailer will be added to accommodate the swing site. The school will likely become a permanent swing site following the completion of the Hart MS modernization, and the design shall accommodate this consideration; this means that in the future, another school will co-locate on the campus with Hart MS. The Design-Builder shall work with DGS, and DCPS in an early planning phase on how best to approach the internal swing with consideration given to future co-location, security, site safety, constructability, phasing, and cost. It is expected that both the swing portion and the modernized portion of the Hart campus will have separate control systems. HVAC systems and utility connections/accounts. SBE goal 35%. Bonds required. Prevailing wages.

Suzi Tabot
 Login or create an account
 Login or create an account

Owner: US Department of General Services (DCDGS) DC

Published 09/09/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450