Bid Date: 12/10/2024 at 02:00pm
7 Days until bid date
Estimate: $8m-$9m
Trades: High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors - General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The Contractor shall convert airfield lighting to LED for Runway 1C-1C and associated Taxiways, as well as replace the Airfield Lighting Control and Monitoring System (ALCMS) at Washington Dulles International Airport (IAD). Work includes conversion of existing quartz and incandescent of runway and taxiway lighting and signage to LED, modify the existing electrical power in the electrical vault and upgrading equipment including constant current regulators, etc., and pavement marking/removal throughout the multiphased project. Bonds required.
Darren Durbin
Login or create an account
Login or create an account
Owner: Metropolitan Washington Air Authority (MWAA) DC
Published 11/22/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.