Replacement of HVAC System at Paint Shop, IAD, Washington, DC

District of Columbia County

Owner Reference: 24-26854

Bid Date: 12/13/2024 at 02:00pm
11 Days until bid date

Estimate: $1.6m-$1.9m

Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Exhaust Systems, Air Handler/Air Chillers. Includes RTU's

The Contractor shall provide all supervision, labor, equipment, materials, vehicles, fuel, tools, and transportation required to perform the replacement of the heating, ventilation and air-conditioning system at the Paint (Autobody) Shop at Washington Dulles International Airport (IAD). SLBE goal 100%. Bonds required.

Anisa Papadhima
 Login or create an account
 Login or create an account

Owner: Metropolitan Washington Air Authority (MWAA) DC

Published 11/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450