Concourse C Substation A1B Replacement, IAD, Washington, DC

District of Columbia County

Owner Reference: 24-26450

Bid Date: 12/12/2024 at 02:00pm
9 Days until bid date

Estimate: $5m-$6m

Trades: High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

The Contractor shall replace the existing electrical substation A1B located on the apron level at Concourse C, Washington Dulles International Airport (IAD). Work is multiphase and includes demolition, provision of temporary power to all active circuits during switch over, testing (as required in various phases) and provision/installation of feeders, switchgear, transformers, wiring, concrete pads, substation enclosures and all required mechanical electrical and other equipment to support the substation replacement. SLBE goal 25%. Bonds required.

Alfred Joyner
 Login or create an account
 Login or create an account

Owner: Metropolitan Washington Air Authority (MWAA) DC

Published 11/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450