Terminal 1 Historic Façade Repair, DCA, Washington, DC

District of Columbia County

Owner Reference: 24-29241

Bid Date: 02/06/2025 at 02:00pm
23 Days until bid date

Pre-Bid: 01/15/2025 @ 10:00am

Estimate: $500k-$700k

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Poured Concrete Pier and Beam Foundation Contractor, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

The Contractor shall repair the existing eight concrete columns and top beam along the front facade of Terminal 1 at Ronald Reagan Washington National Airport (DCA). Work includes removal of deteriorated concrete around columns and overhead beam, installing new cementitious material, epoxy injection, relocation of electrical conduits and painting to match surrounding paint. Bonds required.

Steven Cocoli
 Login or create an account
 Login or create an account

Owner: Metropolitan Washington Air Authority (MWAA) DC

Published 01/07/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.