Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825682 Posted 5/23/2026

New River Estates Drainage Improvements, Davie, FL

Owner Reference
ITB# RS-26-32
Bid Date
Jun 24, 2026 at 02:00pm
Questions Due By
June 9, 2026, 5:00pm
Pre-Bid
MANDATORY - 6/1/2026 @ 02:00pm @ (for location please or )
Owner
Town of Davie, FL
Trades
CU - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The Project consists of Stormwater collection and discharge improvements in SW 48th Street, SW 55th Avenue, SW 54th Terrace, and a portion of the vacant right-of-way between 55th Avenue and 54th Terrace. The Project area is bounded by Griffin Road on the north, SW 49th Street on the south, SW 52nd Avenue on the east, and Wilson Road on the west, in Section 26, Township 50 South, Range 41 East. The Project consists of the demolition and removal of existing drainage pipelines, manholes and catch basins, as well as the construction of new underground HDPE drainage pipelines, in various diameters, and concrete catch basins and manholes. It also includes the relocation of watermains, and construction of a control structure and HDPE pipe, and RIP-RAP top of bank on the Sunny Lake east berm. Stormwater discharges to the east into the S-4 Canal and construction of a RIP-RAP headwall and installation of a 48-inch flap gate are required. Stormwater discharges to the east into the S-2 Canal and construction of pipe extension and RIP-RAP headwall, and installation of a 36-inch flap gate are required. The Project also requires that road elevations be raised in limited areas, and asphalt, swales and grass restoration in general, and relocation of watermain segments. Permitting processes have been initiated or completed with the Town of Davie Engineering and Utilities Divisions, CBWMD, SFWMD, and Broward County Traffic Division and Resilient Environment Department Environmental Permitting Division. This Project will be partially funded by an EPA Grant, therefore it has special requirements that are described in this Invitation to Bid.

Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825682 | Published 5/23/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208