Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#825686 Posted 5/23/2026

Basin 15 Drainage Improvements - Phase 3 – Hiatus Road Canal Culvert Reinforcement, Sunrise, FL

Owner Reference
BID-26-71-05-HR-0-2026/hr
Bid Date
Jun 25, 2026 at 02:00pm
Pre-Bid
Recommended - 6/8/2026 @ 09:00am @ (for location please or )
Owner
City of Sunrise, FL
Trades
Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The project is located within the 496 acre CITY OF SUNRISE DRAINAGE BASIN 15. The Basin is bordered on the south by NW 44th Street, on the north by Commercial Boulevard, on the west by the South Florida Water Management District C-42 Canal and a portion of the Sawgrass Expressway and on the east by Nob Hill Road. The culvert reinforcement work is located at the Hiatus Road canal crossing between NW 53rd Street and NW 55th Street in the City of Sunrise. The City has instituted an overall project for roadway culvert replacements or reinforcement within the Basin 15 area, which includes the current project work. This project is for the installation of a 54 reinforced concrete pipe (RCP) to be constructed parallel to the existing 54 RCP culvert, and rerouting existing street drainage. The parallel pipe and replacement pipe section are intended to upgrade the hydraulic flow capacity of the culvert crossing to that of a single 72 RCP. The existing canal culvert is designated in the Basin as Culvert R-15-110A. The Work is generally described as follows: Project work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, dewatering, canal bypass pumping, installing 54 RCP, construction of two endwalls and two manhole structures, cutting into and connecting to existing street drainage pipe, demolition, restoration of pavement and curbs, pavement milling and resurfacing, restoration of pavement markings, sodding and other miscellaneous and incidental items for a complete project. The Contractor will be responsible for preparation of as-built record drawings.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 825686 | Published 5/23/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208