**Updated** New Bid Date: 50th-54th Avenue North and 66th St N Water Main Upsize (Project No. 24107-130), Saint Petersburg, FL

Pinellas County

Owner Reference: 25 - 144

Bid Date: 07/10/2025 at 03:00pm
19 Days until bid date

Trades: CU - Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

This project involves the replacement of approximately 1,250 linear feet of 2-inch water main located along the east side of 66th Street North (SR 693) between 50th Avenue North and 54th Avenue North with 6-inch water main. Fire hydrants will be provided at 5051 and 5335 66th Street North. This extension will improve water quality as well as provide a looped system. Bonds required.

Gabriella DiPiazza
 Login or create an account
 Login or create an account

Owner: City of St. Petersburg FL

Published 05/06/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.