2024 CIPP Project, Orofino, ID

Clearwater County

Bid Date: 01/21/2025 at 03:00pm
3 Days until bid date

Pre-Bid: 01/07/2025 @ 02:00pm

Trades: PWC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The Project generally consists of three schedules of cured-in-place pipe (CIPP) rehabilitation of sanitary sewer mains and laterals including sewer bypass pumping, cleaning, closed-circuit television (CCTV) inspection, cutting off protruding taps, reinstating laterals, testing, and other miscellaneous and related items of work. Schedule A consists of approximately 729 linear feet of 18-inch sanitary sewer pipe, 494 linear feet of 10-inch sanitary sewer pipe, 249 linear feet of 6-inch sanitary sewer pipe, and CIPP rehabilitation of approximately 16 sewer laterals. Schedule B consists of approximately 1,346 linear feet of 18-inch sanitary sewer pipe. Schedule C consists of approximately 410 linear feet of 8-inch sanitary sewer pipe. The intent is to award all schedules based on available funding and to perform the work under one Notice to Proceed. Bonds required. Prevailing wages.

S. Schramm, J-U-B Engineers
 Login or create an account
 Login or create an account

Owner: City of Orofino ID

Published 12/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.