Bridge Preservation, B-01-012 (4AP) and B-01-014 (4AN), Oak Street over Route 6 (Mid-Cape Highway), Barnstable, MA

Barnstable County

Owner Reference: Call 004 613202-129788 District 5

Bid Date: 04/29/2025 at 02:00pm

Estimate: $1,889,000.00

Trades: Highway, Bridge, Railroad, Airport Construction, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The work under this contract consists of furnishing all necessary labor, materials, and equipment required to perform work as described below: 1. Install Advanced Warning Signs. 2. Selective Clearing and Thinning. 3. Install Temporary Barrier Limited Deflection TL3 for work zone for Stage I. 4. Install Temporary Pavement Markings. 5. Install Temporary Protective Shielding for demolition. 6. Remove and Stockpile Existing End Posts and New England Pink Granite in Stage I. 7. Remove and Dispose granite curb in Stage I. 8. Excavate existing bridge barrier and safety walk. 9. Perform any drainage repairs and upgrades in Stage I. 10. Drill and Dowel for new barrier in Stage I. 11. Form and Pour new CP-MTL3 barrier with safety fence in Stage I. 12. Install Highway Guardrail Transition, TL2 Tangent End Treatment, and Trailing Anchorage per plans in Stage I. 13. Remove Temporary Protective Shielding and install for Stage II. 14. Reset Temporary Barrier to Stage II location. 15. Grind and Install new Temporary Pavement Markings. 16. Remove and Stockpile Existing End Posts and New England Pink Granite in Stage II. 17. Remove and Dispose granite curb in Stage II. 18. Excavate existing bridge barrier and safety walk in Stage II. 19. Perform drainage repairs and upgrades in Stage II. 20. Drill and Dowel for new barrier in Stage II. 21. Form and Pour new CP-MTL3 barrier with Safety Fence in Stage II. 22. Install Highway Guardrail Transition, TL2 Tangent End Treatment, and Trailing Anchorage per plans in Stage II. 23. Perform Substructure repairs. 24. Apply Elastomeric protective coating. 25. Remove Temporary Barrier. 26. Bridge Pavement Milling of the entire bridge wearing surface of 1½”. 27. Replace milled wearing surface with 1 ½” of Superpave Bridge Surface Course – 9.5 Polymer (SSC-B - 9.5 - P). 28. Install new pavement markings. Locations: • Bridge B-01-012 (4AP) Oak Street over Route 6 WB in Barnstable • Bridge B-01-014 (4AN) Oak Street over Route 6 EB in Barnstable. DBE Goal: 10% Bonds required. Prevailing wages.

Construction Contracts Engineer (Email Only)
 Login or create an account
 Login or create an account

Owner: Commonwealth and State of Massachusetts Department of Transportation (MassDOT or MADOT) MA

Published 04/16/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450