Replace Boiler Controls, FCI Sandstone 24Z4AZ3, Sandstone, MN

Pine County

Owner Reference: 15B41325Q0000000

Bid Date: 01/24/2025 at 12:00pm
10 Days until bid date

Pre-Bid: 01/16/2025 @ 09:00am

Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Exhaust Systems, Air Handler/Air Chillers. Includes RTU's

Total Small Business Set-Aside, 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The project consists of the replacement of the boiler controls system on three (3) high pressure boilers and installing a compatible master panel with at least a 12-inch color touch screen. Bonds required. Prevailing wages.

Jacob Polk
 Login or create an account
 Login or create an account

Owner: US Federal Bureau of Prisons (BOP) USA

Published 01/04/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450