Route 61/67: Pavement, Grading, Slide Repair, and Bridges + Lane Widening, Coldmill, and Resurface, Jefferson County, MO

Jefferson County

Owner Reference: J6S3289 and J6S3391

Bid Date: 06/20/2025 at 11:00am

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Road Resurface, Seal Coat, High Friction Treatment, Milling, Asphalt, Land Clearing, Trails/Path

(1): Job J6S3289 Route 61/67 Jefferson County. Pavement, grading, slide repair, and bridges over Joachim Creek near Pevely, the total length of improvement being 0.759 miles. (2): Job J6S3391 Route 61/67 Jefferson County. Lane widening, coldmill, and resurface from Brandon Wallace Way to 6th Street, the total length of improvement being 0.82 miles. DBE goal 6%. Bonds required. Prevailing wages.

Purchasing
 Login or create an account
 Login or create an account

Owner: State of Missouri Department of Transportation (MODOT) MO

Published 05/15/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450