Norwood Pump Station Generator Addition, Tualatin, OR

Washington County

Bid Date: 06/18/2025 at 02:00pm

Pre-Bid: 06/10/2025 @ 10:00am

Estimate: $200,000

Trades: Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems

Major items of work include furnishing and installing a new 175kW standby generator, associated underground and above-ground conduit and wiring, related panel modifications, updates to SCADA and signal wiring, concrete generator foundation, and all associated site restoration and electrical testing necessary to provide a complete and functional emergency backup power system for the Norwood Pump Station, as shown in the plans. Bonds required. Prevailing wages.

Richard Contreras
 Login or create an account
 Login or create an account

Owner: City of Tualatin OR

Published 06/10/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.