SR 48 Mill and Overlay, McKeesport Township, PA

Allegheny County

Owner Reference: 108528

Bid Date: 03/13/2025 at 11:00am

Estimate: $10m-$12.49m

Trades: Stormwater Drainage; Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, French Drains, Underdrains, Dewatering, Water Swa, Earthwork & Paving Contractor: Resurface, Seal Coat, Milling, Highway/Roads/Runways/Bridges, Asphalt, Land Clearing, Trails/Path, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, Standard & High-Risk Safety Systems: Vehicle Guides Barricades Barriers Guardrail Attenuators Crash Cushions Bollards

For the milling and resurfacing, base repair, concrete patching, drainage, guide rail, pavement markings, and other miscellaneous construction all within a length of 61,530 linear feet (11.65 miles) as indicated on the approved drawings included in the bid package for Allegheny Group 111-25-7135-3 in Allegheny County, City of McKeesport, Elizabeth and North Versailes Townships, and White Oak, Lincoln, Versailes and East Pittsburgh Boroughs, Commonwealth of Pennsylvania. This project being situated as follows: SR 0048, Section A45 (Long Run Road) - From SR 0148 (Walnut Street) at Segment 0170/0171 Offset 0000/0000 (Station 536+21) to SR 2031 (Lincoln Way) at Segment 0220/0221 Offset 0056/0056 (Station 657+58). SR 0048, Section A46 (Boston Hollow Road & Scenery Drive) - From Cowan Drive (Township Road) at Segment 0060 Offset 2584 (Station 266+10) to SR 0148 (Walnut Street) at Segment 0170 Offset 0000 (Station 536+21). SR 2037, Section A19 (McKeesport Boulevard) – South from SR 2112 (Electric Avenue) at Segment 0101 Offset 1381 (Station 156+50) to SR 2068 (Navy Marine Corp Way) at Segment 0051 Offset 1816 (Station 166+16) and north from SR 2068 (Navy Marine Corp Way) at Segment 0050 Offset 1746 (Station 166+16) to SR 2112 (Electric Avenue) at Segment 0100 Offset 1320 (Station 157+00). SR 2068, Section A03 (Navy Marine Corp Way) - From SR 2037 (McKeesport Boulevard) at Segment 0010/0011 Offset 0000/0000 (Station 0+00) to SR 0030 (Lincoln Highway) at Segment 0010/0011 Offset 1385/1385 (Station 13+85). SR 2083, Section A02 (Braddock Avenue) - From a point 125 feet north of SR 2183 (Cable Avenue) at Segment 0032/0033 Offset 0050/0051 (Station 96+83) to the end of SR 2083 (Braddock Avenue) at Segment 0012 Offset 0000 (Station 110+79). DBE goal 10%. Bonds required. Prevailing wages.

ECMS
 Login or create an account

Owner: State of Pennsylvania Department of Transportation (PENNDOT/PADOT) PA

Published 02/28/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450