Sugar Run Road Intersection Reconstruction, Franklin Township, PA

Greene County

Owner Reference: 96659

Bid Date: 03/13/2025 at 11:00am

Estimate: $2.5m-$4.99m

Trades: Earthwork & Paving Contractor: Resurface, Seal Coat, Milling, Highway/Roads/Runways/Bridges, Asphalt, Land Clearing, Trails/Path, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage; Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, French Drains, Underdrains, Dewatering, Water Swa

Replacement of the existing four leg, three leg stop controlled Intersection with a roundabout. This project includes a design build traffic control plan with detailed conceptual plan provided. Additionally, the project will include a bridge replacement, a stormwater management basin, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 2003, Section U20, in Greene County Franklin Township from approximately 0.5 miles south of SR 0019 at segment 0320 offset 1455 to segment 0320 offset 2229. Bonds required. Prevailing wages.

ECMS
 Login or create an account

Owner: State of Pennsylvania Department of Transportation (PENNDOT/PADOT) PA

Published 02/28/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.