RFP St. Helen’s Manor Fire Panel Replacement, Battle Ground, WA

Clark County

Owner Reference: 2025-019

Bid Date: 07/03/2025 at 02:00pm

Pre-Bid: 06/16/2025 @ 01:00pm

Trades: Fire Alarm, Fire Protection Systems, Smoke Detection & Fire Suppression Contractor, Fire Pumps & Fire Hydrants

For a contract for the purchase of contractor services related to the replacement of the existing fire panel. The VHA is seeking Design/Build Proposals for the replacement of its existing Fire Alarm Control Panel. The existing Edwards fire alarm system is no longer supported for replacement of components and is at “end of life”. The purpose of this project is to enhance safety measures for staff and the public by replacing the existing non-addressable panel with a new code compliant addressable panel and new fire life safety devices as required by code. The project is being conducted in an occupied building which will require planning and consideration to minimize the amount of time the fire alarm is out of service. Bonds required. Prevailing wages.

Procurement and Contracts
 Login or create an account
 Login or create an account

Owner: Vancouver Housing Authority (VHA) WA

Published 06/13/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.