SW Lopez Drive Reconstruction Project, Oak Harbor, WA

Island County

Owner Reference: ENG-24-02

Bid Date: 06/16/2025 at 02:00pm

Estimate: $1,100,000 - $1,350,000

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The project consists of the reconstruction of SW Lopez Drive and SW Kirk Lane, including, but not limited to, replacement of water main, storm drainage facilities, removal of existing asphalt-concrete surfaces, excavation, grading, sub-grade preparation, crushed surfacing materials, placing and compacting hot mix asphalt, cement concrete sidewalk replacement, traffic control and other work. Bonds required. Prevailing wages.

City Clerk
 Login or create an account

Owner: City of Oak Harbor WA

Published 05/25/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.