SOURCES SOUGHT Repair Ghost DFAC (Building 3757), Lewis-McChord (JBLM), WA

Pierce County

Owner Reference: W912DW25B17HG

Bid Date: 06/16/2025 at 01:00pm

Estimate: $5.0M - $10.0M

Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors

HVAC: Replace existing HVAC equipment with new AHUs Replace the central primary gas fired steam boiler, converters, controls, valves and piping Provide HVAC Loads, DALT, and TAB Demolition, removal, and disposal of existing DDC control systems Mechanical Work involves removing and replacing and/or re-installing some Fire Alarm devices Provide Exterior Mechanical Yard for mechanical system Plumbing: Demolition, removal, disposal, and replacement of existing domestic water system Provide high-temperature water supply for new electrical dishwasher, pot and pan wash, and can wash Finishes: Ceiling demo, repair/replacement as required Cut and patch other surfaces as required Remove and replace 2’x4’ ceiling tile and GWB ceiling Structural: HVAC Scope of Work will require structural strengthening of roof structure elements for all new mechanical equipment supported by the roof structure Hazardous Materials: Asbestos materials have been identified or assumed throughout the project area. Any asbestos-containing materials that will be impacted by the planned repairs must be removed and disposed of prior to be disturbed Electrical: Remove and re-install existing lighting and electrical devices in the reinstalled/replaced ceiling Electrical disconnect & re-connect Install new / upgrade the electrical service to accommodate new equipment Provide new breakers, wire, and conduit Provide new disconnects and fuses Provide coordination with City, Light, and Power (CLP) for new transformer Roofing and Envelope Remove Modified Bitumen BUR system and replace with 60 mil EPDM system, recover board and R-30 insulation Evaluate, clean, and repair all damaged masonry in exterior walls Re-seal around all windows Replace indicated 6’x7’ HM mechanical room doors and hardware and seals Civil Assuming piping is half under concrete – 60 feet of piping to water heater, 60 feet of pipe to cooling tower, 30 feet of 5-foot-wide trenching, soil compaction, 40 feet of sawcuts, 75 square feet of concrete removal, 30 feet of 5-foot-wide trench backfill, 75 square feet of concrete replacement, 75 square feet of hydroseed surface restoration Assuming piping is half under concrete – 30 feet of refrigeration pipe, 30 feet of trenching, soil compaction, 35 square feet of concrete removal, 30 feet of trench backfill, 35 square feet of concrete replacement, 35 square feet of hydroseed surface restoration Electrical – Install new / upgrade the electrical service to accommodate new equipment All other Work associated to the other sections of this project and as shown in the construction documents Additional Work Add a heat pump chiller/water heater Add a heat pump water heater with external condenser Replace existing plumbing fixtures If your organization has the potential capacity to perform these contract services, please provide the following information: UEI Number CAGE Code POC’s name, physical address, email address, and telephone number Website address Small business size, socioeconomic categories, and type of ownership for the organization Capability Statement Organization’s bonding capability Bonds required. Prevailing wages.

John McGuire
 Login or create an account
 Login or create an account

Owner: US Department of the Army (USACE) WA

Published 06/01/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.