Water System Upgrades Project, Lopez Island, WA

San Juan County

Owner Reference: CRWU 25-01

Bid Date: 04/17/2025 at 02:00pm

Pre-Bid: 04/07/2025 @ 12:00pm

Estimate: $500,000 - $600,000

Trades: Water Well Construction, Watershed Improvements & Water Tables Aquifer Storage, Drilling, Installation & Repairs

The Project includes but is not limited to the following Work: - Selective demolition of existing facilities at the school's pumping station - Installation of a new flow paced packaged booster pumping station - Installation of an LP engine generator and 500-gallon LP tank - Changes to yard piping outside the school's pumping station - Mechanical improvements to the school's existing Mount Baker Silo storage tank - Electrical improvements at the school property related to the pump station work, the storage tank work and the new generator. - Installation of 2050 LF of 2-inch fusion welded HDPE well supply line and 2050 LF of 2 inch fusion welded HDPE potable distribution main in a single trench - Electrical and Mechanical modifications to an existing developed well - Electrical and Mechanical development to an existing undeveloped well Bonds required. Prevailing wages.

Brady Smith, email only
 Login or create an account
 Login or create an account

Owner: Lopez Island School District WA

Published 03/20/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.