ID 729618
Snohomish County
Owner Reference: 2023-515 G (1-1)
Bid Date: 12/03/2024 at 01:00pm
Pre-Bid: 11/13/2024 @ 01:00pm
Estimate: $790,000 - $935,000
Trades: *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors
The Project consists of building and site improvements at the WSP’s Marysville District Headquarters. The work includes, but is not limited to, the following: 1. 2. 3. 4. 5. 6. 7. 8. At building perimeter, demolish existing wood trellises in 4 locations, including foundations down to 1 foot below grade. At building courtyard, selectively demolish wood trellis components, leaving support framing in place. Replace will similar wood components. Patch locations at which wood trellises were attached to building with new stucco. At building facades clad with ceramic tile at wainscot level, clad tile with new phenolic wall panels. Attach panels using exposed fasteners to horizontal galvanized steel ventilated hat channel spaced at 12 inches on center. Secondary purpose of hat channel is to prevent displacement of ceramic tile. Provide closures at edges of, and gaps between, phenolic wall panels to prevent ingress of wall into rainscreen cavity. Provide new stainless steel fabrications at existing window sills and integrate them into phenolic wall panel assemblies. At building facades clad with ceramic tile above wainscot level, clad tile with new wood siding boards. Attach boards using exposed fasteners to horizontal galvanized steel ventilated hat channel spaced at 12 inches on center. Secondary purpose of hat channel is to prevent displacement of ceramic tile. Provide closures at edges of wood siding to prevent ingress of wall into rainscreen cavity. Provide new stainless steel fabrications at existing window sills, and stainless steel flashings at jambs and heads, at windows located within new wood siding. Selectively provide full-depth asphalt pavement replacement. Selectively replace existing extruded curbs with concrete curb and gutter. Selectively provide extruded curb replacement. In addition, 3 alternate bid items have been established for this project: 1. If Alternate Bid Item No. 1 is accepted by the Owner, Project scope will be amended to include additional full depth asphalt pavement replacement as indicated on drawings. 2. 3. If Alternate Bid Item No. 2 is accepted by the Owner, Project scope will be amended to include additional full depth asphalt pavement replacement as indicated on drawings. If Alternate Bid Item No. 3 is accepted by the Owner, Project scope will be amended to include additional extruded curb replacement as indicated on drawings. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. Bonds required. Prevailing wages.
Kevin Barber
Login or create an account
Login or create an account
Owner: State of Washington Department of Enterprise Services (DES) WA
Published 11/06/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450