**New bid due date**Port Gardener Storage Facility, Everett. WA

Snohomish County

Owner Reference: UP-3525

Bid Date: 07/15/2025 at 02:00pm
Bids Today

Pre-Bid: 06/10/2025 @ 10:00am

Estimate: $103,790,000

Trades: Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors

The City of Everett Port Gardner Water Quality Program serves to improve water quality in the Possession Sound and Port Gardner Bay by reducing combined sewer overflows and providing regional stormwater treatment for more than 200 acres of urban watershed. Phase 1 of the program includes the design of the Port Gardner Storage Facility (PGSF). The City of Everett acquired the Kimberly-Clark Wastewater Treatment Plant in 2019 to repurpose the infrastructure into the PGSF. The PGSF will provide temporary combined sewer storage, reducing CSOs at the City’s four remaining uncontrolled CSO discharge points to meet the Washington State Department of Ecology executed Agreed Order number 11638.This facility will also provide stormwater treatment for separated stormwater drainage basins with conveyance to the City’s deepwater outfall and local stormwater conveyance to the Everett Water Pollution Control Facility. Construction of the PGSF involves retrofit of the project site through installation of combined sewer and stormwater infrastructure. This includes, but is not limited to, buried conveyance pipelines, construction of two green field pump stations, rehabilitation of the existing aeration basins and secondary clarifiers, installation of a ground stabilizing buttress wall, pre-cast and cast in place vaults, architectural improvements made to existing buildings, installation of electrical systems, instrumentation and controls, and pile supports for new and existing structures. This work also involves all facility commissioning and start-up activities. Section 01 11 00 Summary of Work provides a detailed narrative of the project scope of work. Construction of the PGSF is planned to commence in August 2025 and must be operational by December 31, 2027, to be in compliance with the Agreed Order 11638 deadline. Bonds required. Prevailing wages.

Zack Brown, email only
 Login or create an account
 Login or create an account

Owner: City of Everett WA

Published 05/20/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.