N 51st Street Bridge over Beaver Creek Remove Structure, Storm Sewer, Concrete Channel, Excavation, Etc , Milwaukee County, WI

Milwaukee County

Owner Reference: 20250513010

Bid Date: 06/13/2025 at 11:00am

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

V Brown Deer N 51st Street Bridge over Beaver Creek Removing structure, storm sewer, concrete channel, excavation common, excavation for structures bridges, backfill structure, base aggregate dense, concrete pavement approach slabs, concrete masonry bridges, HMA pavement, asphaltic surface, bar steel reinforcement, temporary shoring, railing steel, apron endwalls for culvert pipes, culvert pipes, pile steel, concrete curb & gutter, concrete sidewalk, riprap heavy, storm sewer, manholes, topsoil, erosion control, restoration, signing, marking, utility line openings, coarse aggregate mix for stream bed, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. DBE goal 8%. Bonds required. Prevailing wages.

Projects/Procurement
 Login or create an account

Owner: State of Wisconsin Department of Transportation (WIDOT) WI

Published 05/01/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450