RFQ Barbee Towers Elevator Renovations, Clearwater, FL

Pinellas County

Owner Reference: QSP 24-009

Bid Date: 05/22/2024 at 02:00pm
3 Days until bid date

Trades: Elevator Contractor: Installation, Repairs & Related Building Equipment

Standard Elevator • Remove existing interior to one (1) 2,000 LBS elevator cabs (handrails, front return, transom, jambs, and bumpers to remain). • Install four (4) raised, vertical panels, sheathed in plastic laminate in each cab. (laminate color to be chosen by CHA) (1 panel on either side and 2 panels on the back wall). • Re-clad frieze and reveals with ventilation slots using new #4 stainless steel. • Install new #4 stainless steel ceiling ensuring a close cut to the canopy. • Install six (6) LED down lights in canopy. • Re-clad doors with new #4 stainless steel. Flooring • Repair subfloor if needed. • Install new, Nucor, waterproof vinyl flooring. (WilsonArt Studio Teak 7960 Standard HPL Finish 51” L X 34.5” W), or equivalent. Freight Elevator • Remove existing interior to one (1) 2,500 LBS elevator cab (handrails, front return, transom, jambs, and bumpers to remain). • Install four (4) raised, vertical panels, sheathed in plastic lamin• Install new #4 stainless steel ceiling ensuring a close cut to the canopy. • Install six (6) LED down lights in canopy. • Re-clad doors with new #4 stainless steelate. (laminate color to be chosen by CHA) (2 panels on either side wall).• Re-clad frieze and reveals with ventilation slots using #4 stainless steel. Flooring • Repair subfloor if needed. • Install new, Nucor, waterproof vinyl flooring. (WilsonArt Studio Teak 7960 Standard HPL Finish 51” L X 34.5” W), or equivalent.Hoistway Frames and Door Entrances • Re-clad all three (3) frames at elevator doors on first floor with new #4 stainless steel. • Re-clad all three (3) hoist way doors at elevators on first floor with new #4 stainless steel. Bonds required. Prevailing wages.

Mikki Cvetinovic
 Login or create an account
 Login or create an account

Owner: Clearwater Housing Authority (CHA) FL

Published 04/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.