East Link Passenger Integration Bus Stop Improvements 2024-2025 Work Order, King Co, WA

King County

Owner Reference: KC001126, Grant No. WA2023-045

Bid Date: 05/21/2024 at 01:30pm
2 Days until bid date

Pre-Bid: 05/14/2024 @ 02:00pm

Estimate: NTE $1.0M

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Subcontractors, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Trucking, Hauling, & Moving - Relocation & Transportation of Goods & other Freight Services NIGP 962-86, Earthwork and Paving Contractor, Land Clearing, Path & Trail Construction: General Engineering Contractor, Construction Zone Traffic Control Contractor - General Engineering Contractor

Includes Work Orders for various construction improvements at Metro Transit Facilities. Sites include, but are not limited to, sidewalks/roadways, traffic signals, transit bases, bus zones and park and ride lots located within King County, Washington. 15% minimum Apprentice Utilization Requirement, Subcontracting Opportunities: Concrete Flatwork, Trucking for Disposal of Waste Material, Asphalt Paving, Electrical Work, and Traffic Control Services Bonds required. Prevailing wages.

Kelly McKeever
 Login or create an account
 Login or create an account

Owner: County of King WA

Published 04/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.