ID 533554

Archived

13.490 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation Project, Gainesville GA

Bleckley County

Owner Reference: M004853

Bid Date: 04/17/2020 at 10:00AM

13.490 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on Sr 112 Beginning at Sr 87 and Extending to Sr 19. As a minimum, clean sediment from all temporary erosion control devices (except temporary sediment basins) installed on the project when one-half the capacity by volume, as measured by depth, has been reached. Clean sediment from all temporary sediment basins installed on a project when one-third the capacity of the storage volume has been filled. Handle excavated sediment from any erosion or sediment control device in one of the following ways: Remove sediment from the immediate area and immediately stabilize it to prevent the material from refilling any erosion or sediment control device.  Place and mix it in the roadway embankment or waste it in an area approved by the Engineer. Repair or replace at no cost to the Department any erosion or sediment control device that is not functioning properly or is damaged due to negligence or abuse. Construction exit tire cleaning station shall be installed when conditions dictate additional tire cleaning measures are necessary to assist in protecting public roadways. Tire cleaning station shall consist of two pressure washers, water source and necessary labor and materials to clean tires of exiting vehicles. When conditions warrant the use of the tire cleaning station or as directed by the Engineer, the Department will pay $750 dollars per day for the use. The Contractor may submit other construction exit tire wash assembly and sediment storage methods for review and approval by the Engineer. This project encouraged MBE/WBE participation.

Georgia Department of Transportation

Timothy Swink
 (404) 631-1148
 Login or create an account To view email

Published 03/23/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.